![]() ![]() The district worked with the City of Oberlin to conduct a cost analysis and determined that the solar array would create a more efficient cost savings installed on the roof of the PreK-12 building. Oberlin City Schools were unable to secure a Power Purchase agreement to install a solar array by the retention pond. The work on the new school building continues with the digging and pouring of the footers. The road is expected to open prior to the first day of school. The walkways and curbs at the south end of the existing high school will be replaced over the next month so that the paving of the road and parking areas can all be completed by the time students and teachers return to school. The project shifted to completing utility installation while those areas are drying out. The installation of the new road around the old Oberlin High School track has been delayed because of the wet spring months. ![]() ![]() The retention pond has been constructed and the outlet structure is being installed. The waterline has been tied in at all three locations including the east side of the site, and to North Park Street and North Pleasant Street. TDA, an architectural design firm, has begun working on installing utilities. The new PreK-5 project is moving forward. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |